Daily production log template
The shift-end record for one line: what was planned, what was produced, how many units were good, how many minutes the line ran and stood still, and why. Defect rate, achievement rate and the totals are formulas, so the supervisor only enters counts and minutes and the sheet is ready for the morning production meeting.
Fill it in right here
Click any blank cell and type. Totals and amounts calculate as you go, and you can print it, save it as PDF or download the filled-in Excel file.
My documents
Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.
| Product / part no. | Planned | Produced | Good | Defects | Defect rate | Achievement | Run time (min) | Downtime (min) | Downtime reason | Notes |
|---|---|---|---|---|---|---|---|---|---|---|
| Total |
Defect rate = defects ÷ produced; achievement = produced ÷ planned. Produced counts good and defective units together, so good + defects = produced. The totals row recomputes both rates from the column sums.
How to use this tool
- Fill in company, line, date, shift, supervisor and headcount in the header; coming from the UPH calculator the headcount is prefilled. The values are written into the file.
- Open the Excel file and enter one row per product or part number: planned quantity, produced, good and defect counts, run and downtime minutes and the downtime reason. Defect rate, achievement and the totals row calculate themselves.
- Write issues and handover notes for the next shift in the section below the table, then sign the prepared, reviewed and approved boxes and file the log.
Frequently asked questions
What should a daily production log record?
At minimum the line, date and shift, the people on the line, and for each product the planned and actual quantity, good and defective units, run and downtime minutes and the reason for every stop, plus a handover note for the next shift. With those fields the log feeds the UPH board, the OEE sheet and the defect analysis without re-entering numbers.
How are defect rate and achievement calculated?
Defect rate divides defects by produced units for each row, and achievement divides produced by planned. The totals row does not average the row percentages; it recomputes both from the column sums, so a product with 5,000 units weighs more than one with 50. Rows with no produced quantity stay blank instead of showing errors.
Should produced include defects or only good units?
Produced is everything that came off the line, good and defective, so good plus defects should equal produced. Keeping it that way makes the defect rate comparable with the quality factor in OEE, where quality equals good count divided by total count. If your plant counts only good units, write that convention in the notes so the rates are read correctly.
How does this differ from the UPH tracking sheet?
The UPH sheet follows one line hour by hour against a target rate during the shift. The daily log is the summary at shift end, with one row per product and the downtime reasons, and it is the document that gets signed and filed. Many plants keep both: the hourly board on the line, the log for the record.
Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.