Daily OEE tracking sheet

OEE, overall equipment effectiveness, combines availability, performance and quality. Record planned time, downtime, total count and rejects for each day; the sheet calculates run time, each factor, OEE and monthly totals. From the OEE calculator, choose a record date and add all the measurements to an empty row. Existing rows are preserved, and conflicting cycle times require a separate document.

Fill it in right here

Click any blank cell and type. Totals and amounts calculate as you go, and you can print it, save it as PDF or download the filled-in Excel file.

My documents

Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.

Open all my documents
Daily OEE Tracking Sheet
DatePlanned time (min)Downtime (min)Run time (min)Total countRejectsAvailabilityPerformanceQualityOEEMain stop reasons
Total

OEE = Availability × Performance × Quality. Availability = run time ÷ planned time; Performance = (ideal cycle time × total count) ÷ run time; Quality = good count ÷ total count. Planned time excludes breaks and days without production. The totals row recomputes each factor from the monthly sums rather than averaging the daily percentages.

How to use this tool

  1. Enter the equipment or line, the month and the ideal cycle time in seconds per unit in the header. The ideal cycle time is the design or best demonstrated speed, not the average.
  2. Enter daily measurements on this page or add a record from the OEE calculator after checking the date. Save named versions in My documents and download the completed Excel file.
  3. Read the monthly OEE in the totals row, note the main stop reasons per day, and use the lowest of the three factors to choose where to act: stops, speed losses or rejects.

Frequently asked questions

How is OEE calculated on this sheet?

OEE = availability × performance × quality. Availability = run time ÷ planned time, where run time = planned time − downtime. Performance = (ideal cycle time × total count) ÷ run time, with both sides in minutes. Quality = (total count − rejects) ÷ total count. A day with 480 planned minutes, 45 minutes down, 15,000 units at 1.5 seconds and 300 rejects gives 90.6% × 86.2% × 98.0% = 76.6%.

What counts as planned production time?

The time the equipment was scheduled to run: shift length minus breaks, planned meetings and days with no production. Unplanned stops such as breakdowns, changeovers and material shortages go into downtime. Whether changeovers count as downtime or are taken out of planned time is a policy choice; write it down and apply it the same way every day.

Why is the monthly OEE not the average of the daily values?

Averaging percentages gives short days the same weight as long ones. The totals row sums planned time, downtime, run time, counts and rejects for the month and recomputes availability, performance and quality from those sums, then multiplies them. That is the monthly OEE a plant reports and the figure to compare month on month.

What is a good OEE?

A commonly cited world-class benchmark is 85%, made of availability 90% × performance 95% × quality 99%; many discrete manufacturers measure 60% or lower the first time they track it. The trend and the weakest factor matter more than the absolute figure, so compare months on this sheet before comparing yourself with benchmarks.

Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.