UPH tracking sheet (hourly output)
The hourly board that every line supervisor keeps, as a spreadsheet. Set the target UPH, headcount and planned hours once, then record the actual output per time slot; cumulative output, achievement against target and UPPH are calculated, and the totals row gives the shift result. Coming from the UPH calculator, the header is already filled in.
Fill it in right here
Click any blank cell and type. Totals and amounts calculate as you go, and you can print it, save it as PDF or download the filled-in Excel file.
My documents
Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.
| Time slot | Target | Actual | Cumulative | Achievement | Downtime (min) | UPPH | Notes / stop reason |
|---|---|---|---|---|---|---|---|
| 08:00–09:00 | |||||||
| 09:00–10:00 | |||||||
| 10:00–11:00 | |||||||
| 11:00–12:00 | |||||||
| 12:00–13:00 | |||||||
| 13:00–14:00 | |||||||
| 14:00–15:00 | |||||||
| 15:00–16:00 | |||||||
| 16:00–17:00 | |||||||
| 17:00–18:00 | |||||||
| Total |
UPH = units per hour; UPPH = UPH ÷ headcount. Lower the target in slots that include a break or a planned stop, and write the reason for every stop in the notes column.
How to use this tool
- Enter line, date, shift, target UPH, headcount and planned hours in the header. If you arrived from the UPH calculator these are prefilled; the target UPPH and planned output are computed in the sheet.
- Open the Excel file and type the actual units for each hour slot as the shift goes on. Cumulative output, achievement rate and UPPH update automatically.
- Record downtime minutes and the reason for each slot that missed target, then sign the sheet at the end of the shift and file it for the daily production meeting.
Frequently asked questions
How is the hourly target set?
Each slot inherits the target UPH from the header, so a line planned at 150 units per hour shows 150 in every slot. Overwrite single cells for slots that contain a break, a changeover or a planned stop; the totals row then sums the adjusted targets and the achievement rate compares actual output with that realistic plan.
What is the difference between UPH and UPPH on this sheet?
UPH is the output of the whole line per hour; UPPH divides it by the headcount in the header and shows what each operator produced per hour. UPPH is the figure to compare across lines of different sizes, and the totals row computes it as total output divided by headcount and planned hours.
Why record downtime per slot?
A slot that misses its target almost always has a stop behind it: a material shortage, a jam, a quality hold. Writing the minutes and the reason next to the gap turns the sheet into the input for the OEE record and the downtime log, and the pattern across days points to the loss worth attacking first.
Can I use it for a night shift or 12-hour shifts?
Yes. The ten preset slots cover a day shift from 08:00; rename them in the first column for a night shift and insert rows for longer shifts. The formulas reference the header, so added rows keep working when you copy an existing row down.
Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.