UPH and UPPH calculator
UPH (units per hour) = units ÷ hours. UPPH (units per person per hour) = UPH ÷ headcount. Example: 1,200 units in 8 hours with 10 people is 150 UPH and 15 UPPH.
Enter a period with a constant headcount to see both formulas, the line time per unit and the gap to a target output. The staffing estimate assumes the current output per person can be maintained.
Result
- UPH (units per hour)
- 150
- UPPH (units per person per hour)
- 15
- How it was calculated
UPH = 1,200 ÷ 8 h = 150 UPPH = 150 ÷ 10 = 15
- Line time per unit
- 24 s
- Units per minute
- 2.5
How to use this tool
- Enter the units completed and the hours the line ran, excluding breaks and planned stops.
- Enter the number of operators. UPH and UPPH appear instantly.
- Enter a target UPH to compare achievement, the total units needed in those hours and the remaining unit gap. Staffing is an estimate at the current UPPH.
- Download the TXT summary to keep the results and planning assumptions together.
Good to know
- UPH is computed on the hours entered, so a 7.5-hour shift gives a higher UPH than the same output over 8 hours.
Frequently asked questions
What is the difference between UPH and UPPH?
UPH is the output rate of the whole line. UPPH divides that rate by headcount, giving output per person per hour. Compare like-for-like products and time definitions when comparing lines or shifts. Adding people does not necessarily raise output if equipment or another process limits the line.
How do I work out the headcount for a target UPH?
Divide the target UPH by the current UPPH and round up. A line making 1,200 units in 8 hours with 10 people runs at 150 UPH and 15 UPPH, so a target of 200 UPH needs 200 ÷ 15 = 13.3, which rounds up to 14 operators if the per-person rate stays the same.
What is a good UPH or UPPH?
There is no universal target. Compare the same product, process and time basis with the line’s history and planned units per hour. Takt time is time per unit, so convert it to a rate before comparing it with UPH. UPPH helps account for headcount, but differences in equipment and work content still matter.
Should breaks be included in the hours?
Choose the hours that match the question and label that basis. Excluding breaks gives output per production hour; including them gives output per elapsed shift hour. If you also exclude unplanned downtime, you are measuring a different rate. Keep the same definition across periods and targets.
How do I calculate UPH and UPPH from minutes?
Divide minutes by 60 before entering the hours. For 120 units in 45 minutes, enter 0.75 hours: UPH = 120 ÷ 0.75 = 160. With 4 people, UPPH = 160 ÷ 4 = 40. Use the 45-minute example button to try these values.
What if the headcount changes during the shift?
For a combined UPPH, divide total units by total person-hours. If 2 people work 4 hours and 3 people work 2 hours, the total is 2 × 4 + 3 × 2 = 14 person-hours. Producing 140 units gives 10 UPPH. This calculator uses one constant headcount, so calculate periods separately when staffing changes; do not average the resulting UPPH values without weighting them.
Results are estimates for general information. Double-check anything important with an official source.