Work order template

A work order tells the shop floor what to make, how many, by when and how. The header carries the order number, product and part number, quantity, due date, customer reference and issuer; the table lists each process step with the equipment, the work instruction and conditions, the standard time, the operator and a done or pending status. It suits a machine-shop routing as well as a construction or maintenance job.

Fill it in right here

Click any blank cell and type. Totals and amounts calculate as you go, and you can print it, save it as PDF or download the filled-in Excel file.

My documents

Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.

Open all my documents
Work Order
No.ProcessEquipmentWork instruction and conditionsStandard time (min)OperatorStatusNotes
Special notes (quality points, safety)
Prepared by
Approved by
Received by

How to use this tool

  1. Enter the work order number, issue date, product, part or drawing number, quantity, due date, customer or sales order reference and your name in the header. They are written into the file.
  2. Open the Excel file and list the process steps in sequence: process, equipment, the instruction and conditions (settings, tolerances, inspection points), standard time in minutes and the assigned operator.
  3. Add quality points and safety notes in the special-notes section, sign the prepared and approved boxes, and have the receiving supervisor sign on receipt. Mark each step done as the job progresses.

Frequently asked questions

What must a work order include?

A unique order number, the product with its part or drawing number and revision, the quantity, the due date, the customer or sales order it serves, and the sequence of operations with the equipment, instructions, standard time and who performs each step. Quality checkpoints and safety notes go in the special-notes section so they travel with the job.

How is a work order different from a purchase order or a production plan?

A purchase order goes to a supplier and buys something; a production plan schedules quantities per product and day for a whole plant; a work order is the internal instruction to make one job, one lot or one task. Plans release work orders, and finished work orders feed the daily production log.

What is standard time and how do I set it?

Standard time is the minutes a qualified operator needs for one step at a normal pace, including allowances for fatigue and small delays. Take it from a time study, from the takt time analysis or from the average of past jobs. Multiplied by the quantity it gives the planned hours for scheduling and for checking actual against planned.

Can I use it for construction or maintenance work?

Yes. Treat each row as a task rather than a machining step: the equipment column holds tools or machinery, the instruction column holds method and conditions, and standard time becomes the estimated duration. The due date, the receiver signature and the safety notes play the same role whether the job is on a shop floor or a site.

Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.