Construction and fit-out specification template

A written specification for an interior fit-out, renovation or small building job, to attach to the contract and the quotation. After the project, site, client, contractor, work period and drawing numbers, ten sections spell out the scope, demolition and substrate preparation, electrical, plumbing and fire protection, HVAC, floor, wall and ceiling finishes with material, size and grade, fixtures and equipment, quality control, safety and waste, and the handover and defect liability terms.

Fill it in right here

Click any blank cell and type. Print your entries, save them as PDF or download the filled-in Excel file.

My documents

Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.

Open all my documents
Construction and Fit-out Specification
Overview and scope of work
Demolition and substrate preparation
Electrical, lighting, communications
Plumbing, gas, fire protection
HVAC and ventilation
Floor, wall and ceiling finishes (material, size, grade)
Fixtures, signage, kitchen equipment
Quality control, inspection, testing
Safety, waste, neighbor relations
Completion, handover, defect liability

Where the drawings and this specification differ, the order of precedence in the contract applies. Give the product name, grade, size and color code of every finish, and say who supplies owner-selected items.

Accepted by client
Accepted by contractor

How to use this tool

  1. Enter the project, work period, site, issue date, client, preparer, contractor and the related drawing numbers in the header.
  2. Open the Excel file and fill each section, starting with the overview and scope. For finishes state the material, product name or grade, size, color code and the area it applies to. For services state the capacity and ratings and who supplies what.
  3. Check the specification against the drawings and the quotation, correct any differences, and have the client and the contractor sign before work starts.

Good to know

  • Regulatory requirements for fit-out work depend on the country, the building use and the floor area. Confirm them with the local authority and your contractor, and follow the order of precedence written in your contract.

Frequently asked questions

Why is a specification needed when there are drawings?

Drawings show where things go and how big they are. The specification says what they are made of, to what grade and quality, how they are installed and how they are tested. A quotation without a specification leaves "tile" or "paint" open to interpretation, which is how disputes about quality start. Attach the specification to the contract and the quotation so that the price and the standard are tied together.

What should the finishes section state?

For each surface give the location, the material, the product name or grade, the size or thickness, the color or code and the installation method, for example "kitchen floor: non-slip porcelain tile 600 × 600, adhesive-fixed". Say who supplies owner-selected items. Without product names and grades a contractor can only price the cheapest reading of "tile".

Which regulations affect a restaurant or shop fit-out?

It depends on the use and on the country, so confirm with the local authority before finalizing the finishes. Typical issues are fire safety (flame-retardant interior finishes, exits, extinguishers, alarms), licensed trades for electrical, gas and fire protection work, food hygiene rules for kitchen surfaces and ventilation, and accessibility. Put these requirements in the quality and safety sections so the contractor is bound to them.

How is a specification different from an estimate?

The estimate prices the work; the specification describes the work to be priced and built. Use the specification to make bids comparable, then use the estimate or quotation for the prices. If the documents disagree, the contract should say which one prevails, so state the order of precedence in the overview section.

Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.