Construction daily report template
The log a site manager or foreman fills in at the end of every working day. It records the weather and temperature, the progress to date, the work done by trade and location, the workers on site planned against actual, the equipment and materials used, safety issues and the plan for tomorrow, and ends with sign-off boxes for the preparer, the site manager and the client's inspector.
Fill it in right here
Click any blank cell and type. Totals and amounts calculate as you go, and you can print it, save it as PDF or download the filled-in Excel file.
My documents
Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.
Work performed today
| Work type | Description of work | Location | Progress |
|---|---|---|---|
Workforce on site (headcount)
| Worker trade | Planned | Actual | Notes |
|---|---|---|---|
| Total |
Equipment used
| Equipment (size) | No. of units | Hours (h) | Notes |
|---|---|---|---|
Materials delivered / used
| Material | Specification | Qty | Unit | Notes |
|---|---|---|---|---|
How to use this tool
- Enter the project, site, date, weather, temperature, progress to date, preparer and site manager in the header; the values are written into the file.
- Open the Excel file and list the work done today by trade, with location and progress. Then fill in the workers by trade (the planned and actual headcount are totalled), the equipment with units and hours, and the materials delivered or used with quantity and unit.
- Record safety issues, instructions received and anything that delays the work, write tomorrow's plan, and collect the signatures of the preparer, the site manager and the client's inspector.
Good to know
- Record the weather and temperature as they were. The decision to stop work follows your site safety plan and the occupational safety regulations that apply to your site.
Frequently asked questions
What should a construction daily report include?
The date, the weather and temperature, the work done by trade and location with its progress, the number of workers by trade, the equipment used and its hours, materials delivered or used, safety observations or incidents, instructions received and the plan for the next day. Weather and headcount matter most later, because they are the evidence when a delay or an extra cost has to be settled. This template carries all of them on one sheet.
Why record planned and actual workers separately?
The gap between planned and actual headcount explains a schedule slip sooner than the progress figure does. If you planned twelve formwork carpenters and eight came, the shortfall is documented the same day. The workforce table totals both columns, so the day's numbers can go straight into the weekly report.
How should I enter the progress to date?
Enter the overall progress as a percentage of the contract work, for example 42 for 42%, using the method your contract specifies, such as planned versus actual S-curve or the share of the contract sum completed. It sits in the header so the client sees the status at a glance. The sheet does not calculate it, so keep the method the same from day to day.
How is the daily report different from the client's inspection log?
The contractor's daily report records what the contractor did and used. The client's inspector or supervisor keeps a separate log of inspections and instructions. This template has a signature box for the client's inspector so both sides acknowledge the same day's record. Many contracts ask for daily reports, so check yours and keep each day's file until acceptance and the defect liability period have ended.
Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.