Punch list template (defect inspection)

A punch list records every defect found at a walk-through before handover or acceptance, so each one can be assigned, fixed and checked off. Every line has the location, trade, description, photo number, severity (major or minor), the person responsible, a due date, the fix status and who verified the fix. The summary shows how many defects there are, how many are done and the completion rate.

Fill it in right here

Click any blank cell and type. Totals and amounts calculate as you go, and you can print it, save it as PDF or download the filled-in Excel file.

My documents

Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.

Open all my documents
Punch List (Defect Inspection)
No.LocationTradeDefect descriptionPhoto no.SeverityResponsibleDue dateStatusVerified byNotes
Total defects
calculated automatically
Fixed (status Done)
calculated automatically
Completion rate
calculated automatically

Major: affects safety, structure, waterproofing, fire protection or function, or is costly to redo, and must be fixed before handover. Minor: cosmetic or small adjustments that can be fixed in parallel. Set the status to Done only after the fix has been re-inspected.

Inspector
Contractor

How to use this tool

  1. Enter the project, contractor, site, inspector and inspection date in the header.
  2. Walk the building and add one line per defect: location, trade, what is wrong and the photo number, then choose major or minor. Assign a responsible person and a due date for each.
  3. Update the status as work is completed and write down who verified each fix at the re-inspection. Sign off when no open items remain.

Frequently asked questions

What is a punch list?

A punch list, also called a snag list or defect list, is the list of incomplete or defective items found when a building or fit-out is inspected near completion. The contractor has to fix every item before final acceptance and final payment. Make each line specific enough to find: where it is, which trade is responsible, what is wrong and a photo number.

How do I decide between major and minor?

Treat as major any defect that affects safety, structure, waterproofing, fire protection or the function of the space, or that is expensive to redo, and hold the handover until it is fixed. Minor defects are cosmetic or small adjustments, such as a paint scratch or a loose cover plate, and can be fixed in parallel. Agree the definitions with the client before the inspection.

How does the sheet count completion?

The summary counts the lines that have a defect description, counts those whose status is set to Done in the dropdown and divides the two to give the completion rate. Change a status to Done only after the fix has been re-inspected, and write the name of the verifier next to it, so the rate reflects accepted work only.

How is a punch list different from a warranty claim?

A punch list covers defects found before acceptance, while the contractor is still on site. A warranty claim is about a defect that appears after handover, within the defect liability period set by the contract or by law. Keep the signed punch list as evidence of the condition at handover and log later defects separately. Check your contract for the periods and the procedure.

Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.