Construction cost estimate template (bill of quantities)

A line-item estimate for a construction, renovation or fit-out job. Each line carries the trade, item, specification, unit and quantity; the material and labor unit costs are multiplied by the quantity and an expense amount is added. Line totals, the subtotal, tax and the total estimate are formulas, followed by a box for conditions and exclusions and sign-off boxes for the estimator and the approver.

Fill it in right here

Click any blank cell and type. Totals and amounts calculate as you go, and you can print it, save it as PDF or download the filled-in Excel file.

My documents

Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.

Open all my documents
Construction Cost Estimate (Bill of Quantities)
TradeItemSpecificationUnitQtyMaterial unit costMaterial amountLabor unit costLabor amountExpensesLine totalNotes
Total
Subtotal (before tax)
calculated automatically
Tax
calculated automatically
Total estimate (incl. tax)
calculated automatically

Material and labor amounts are quantity × unit cost. Enter expenses (equipment, transport, insurance and similar) as an amount. Overhead and profit can be built into the unit costs or entered on their own lines in the expenses column.

Conditions and exclusions
Prepared by
Approved by

How to use this tool

  1. Enter the project, client, contractor, estimate date, work period and the tax rate in the header. Set the rate to 0 when no tax applies.
  2. Open the Excel file and enter each work item by trade with its specification, unit and quantity, then the material unit cost, the labor unit cost and any expenses. The material and labor amounts and the line total are calculated.
  3. List what is included and excluded under conditions, for example demolition, permits or owner-supplied items, sign the sheet and send the file or a PDF print to the client.

Good to know

  • The tax rate is 0 by default in this English version. Enter the VAT or sales tax rate that applies to your project, or leave it at 0 when the price is tax-exempt or quoted tax-inclusive.

Frequently asked questions

How is a line total calculated?

The material amount is the quantity times the material unit cost, and the labor amount is the quantity times the labor unit cost. Expenses are entered directly as an amount. The line total adds the three, the totals row sums each column, and the summary applies the tax rate from the header to the subtotal to give the total estimate. Blank lines stay blank.

Why separate material, labor and expenses?

It is the standard way to read a construction estimate. The client can compare unit costs line by line, and a change is easy to follow: a higher material price affects one column, a new labor rate another. Public-sector and larger contracts usually require the split, and it shows whether a low bid is cheap on materials or on labor.

Where do overhead and profit go?

A formal cost breakdown lists indirect costs, general overhead and profit on separate lines. Here you can build them into the unit costs, or add rows such as general overhead and profit and enter the amounts in the expenses column. Show them on their own lines if the client wants a transparent breakdown, and never leave them out, because they are real costs of doing the job.

Is an estimate the same as a contract?

No. An estimate is an offer to do the described work at the stated prices and conditions, and it becomes binding when the client accepts it or signs a contract. State the validity period and the exclusions under conditions and agree any variations in writing. On small jobs the accepted estimate often serves as the contract, so add the payment and schedule terms too.

Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.