Reference Sample Register
Keep a traceable list of the reference samples used for checks. Identify each sample and version, the check it supports, its storage location and who approved its use. Record review dates and status changes so that an obsolete sample can be found and withdrawn.
Fill it in right here
Click any blank cell and type. Print your entries, save them as PDF or download the filled-in Excel file.
My documents
Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.
| Sample ID | Version | Intended check | Storage location | Approved by | Valid from | Review due | Status / disposition |
|---|---|---|---|---|---|---|---|
Set review intervals and acceptance criteria from the approved procedure for the actual sample. No fixed replacement interval is supplied.
How to use this tool
- Enter company, department, prepared by, process in the header for the work you are recording.
- A reference sample is not automatically a calibrated measuring instrument. Keep calibration records for instruments in the calibration register and document the separate approval criteria for each sample in its controlled reference.
- Save a named document in your workspace and copy it for the next period. Use Connect templates to review shared header details before creating separate drafts.
Good to know
- Set review intervals and acceptance criteria from the approved procedure for the actual sample. No fixed replacement interval is supplied.
Frequently asked questions
How should sample IDs and versions differ?
Keep the sample ID tied to the physical reference. Record a new version and valid-from date when the approved criteria change, preserving the earlier version with a distinct status.
What if the physical sample cannot be found?
Do not mark it available without checking. Record a verification-needed status, ask the custodian to check the stated location, and update the status and review date after the physical check.
Does passing the review date automatically revoke approval?
No. The date is a reminder recorded in the register, not an approval engine. Review the sample under your procedures, then update the approver, status and supporting record to reflect the actual decision.
Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.