Work standard sheet (SOP) template
The sheet that tells an operator how to do one process the same way every time. Enter the process, product, document number, revision and takt time once, then list the work elements in order with the method and key points, the quality check, the tools and the seconds each takes. The total time is compared with takt time automatically, and the sections below record what to do on an abnormality and the safety precautions.
Fill it in right here
Click any blank cell and type. Totals and amounts calculate as you go, and you can print it, save it as PDF or download the filled-in Excel file.
My documents
Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.
| Step | Work element | Method and key points | Quality check point | Tools / equipment | Time (s) |
|---|---|---|---|---|---|
| Total |
- Total time ÷ takt time
- calculated automatically
Takt time = available production time ÷ required output. When the total time is above 100% of takt, one operator cannot finish a cycle within takt: split the work or rebalance the line. Enter times measured with a stopwatch on the actual line.
How to use this tool
- Enter the process, product, document number, revision, issue date, preparer, required PPE and takt time in seconds in the header; the values are written into the file.
- Open the Excel file and list the work elements in order. For each one write the method and key points, the quality check point, the tools or equipment and the time in seconds, measured with a stopwatch on the actual line.
- Check that the total time is within takt time, complete the abnormality and safety sections, and have the preparer, reviewer and approver sign. Post the approved sheet at the station.
Frequently asked questions
What should a work standard sheet contain?
It identifies the process, the product, the document number and the revision, then lists the work elements in order. For each element it gives the method and key points, the quality check point, the tools and equipment and the time. Below that go the action to take when something abnormal happens and the safety precautions with the required protective equipment. Write it so a trained operator can do the job from the sheet alone.
How is the total time compared with takt time?
The sheet divides the sum of the time column by the takt time in the header and shows the result as a percentage. At or below 100% the operator can finish one cycle within takt. Above 100% the process needs less work, a second operator or a rebalanced line. Calculate takt time with the takt time calculator and use measured times, not estimates.
How is a work standard sheet different from a work order?
A work order tells the line what to make now: the product, the quantity and the due date for one job. A work standard sheet describes how a process is performed every time, whatever the job, and changes only when the method changes. The order refers to the standard, and the operator follows the standard.
When should the sheet be revised?
Revise it when the method, equipment, material or quality requirement changes, and after a corrective action shows that the written method allowed the problem. Raise the revision number, record the date and the change, post only the current version at the station and withdraw the old copy. Retrain the operators on the change. ISO 9001 audits this as control of documented information.
Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.