Rework progress log (rework tracking sheet)

A rework log follows one rework job on a product lot from the first operation to the release decision. The header identifies the product, lot number and work order; each of the 10 rows records a rework operation with its date, input, accepted and rejected quantities, the status or outstanding work and who checked it, and the closing section records the inspection result and release decision separately from the quantity totals.

Fill it in right here

Click any blank cell and type. Totals and amounts calculate as you go, and you can print it, save it as PDF or download the filled-in Excel file.

My documents

Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.

Open all my documents
Rework Progress Log
DateRework operationInput quantityAccepted quantityRejected quantityStatus / outstanding workChecked by
Total
Inspection and release decision

Check each operation for unaccounted quantities. Final release requires a separate review of the actual inspection results.

How to use this tool

  1. Enter the company, department, product, lot number, preparer and the work order or rework order number.
  2. Add a row for each rework operation in the order it is done, such as sorting, re-machining or relabelling, with the date and the quantity put in.
  3. After each operation, record how many units passed and how many were rejected, what is still open and who checked the result.
  4. The totals add up operations, so a unit that goes through two operations is counted twice. Take the number of units actually released from the final inspection, not from the column totals.
  5. Write the inspection result and release decision in the closing section, keep the inspection record with the log and download the Excel file.

Good to know

  • Check each operation for unaccounted quantities. Final release requires a separate review of the actual inspection results.

Frequently asked questions

What should a rework log include?

What was reworked (product, lot and work order), each rework operation in order with its date, the quantity put in and the quantities accepted and rejected, the status of open work, who checked each step, and the final inspection and release decision. Rejected units need a disposition of their own, such as further rework or scrap, recorded where you track nonconforming product.

What is the difference between rework and repair?

Rework brings a nonconforming product back to the original requirements, so once it passes re-inspection it is conforming product. Repair makes it acceptable for its intended use even though it may still not meet every requirement, so it can need approval. For suppliers working to IATF 16949:2016, Sanctioned Interpretation 9 (clause 8.7.1.1) requires customer authorization before further processing for "use as is" and "rework for repair" dispositions.

Why don't the column totals match the units released?

The totals add each operation's quantities. If 50 units are sorted and the same 50 are then relabelled, the input total shows 100 although only 50 units exist. Use the totals to see the workload and the rejects per operation, take the number of units released from the final inspection record, and do not read the input total as a yield.

How should reworked product be re-inspected?

Check reworked units against the original specification and acceptance criteria rather than a relaxed version, using the method your control plan or inspection standard sets for that characteristic. Record who checked them and the result before release, and keep reworked units identified until the check is complete so they are not mixed with untouched stock.

How does the rework log relate to the NCR, the rework cost sheet and the CAPA report?

The nonconformance report records the problem and the decision to rework. This log follows the rework itself, the rework cost sheet adds up the labour, material and other costs, and a CAPA report deals with the cause so the rework is not needed again. IATF 16949:2016 clause 6.1.2.1 includes lessons learned from rework in the minimum content of risk analysis, so keep these records where they can be reviewed together.

Do I have to retype the product and lot number on related templates?

No. After you review them, Connect templates can reuse the company, department, product, lot number and preparer in the rework cost sheet, and the product and lot number in the nonconformance report. The CAPA report has no matching header fields, and operation rows, quantities and the release decision are not copied into other documents. Keep a named copy in your workspace while the rework is open.

Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.