Preventive maintenance plan (PM schedule)

A preventive maintenance (PM) plan lists the inspection, cleaning, lubrication, adjustment and replacement tasks a machine needs before it fails, how often each is due and who does it. This template keeps one machine's plan on one sheet: the header identifies the equipment and the planning period, and each of the 18 rows holds one task with its component, the document it comes from, the interval, the next due date, the assigned person, the date it was actually done and the result.

Fill it in right here

Click any blank cell and type. Print your entries, save them as PDF or download the filled-in Excel file.

My documents

Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.

Open all my documents
Preventive Maintenance Plan
Component / areaMaintenance taskApproved basisIntervalDue dateAssigned personCompleted dateResult / next action

Confirm the current maintenance instructions for the actual equipment before setting intervals or performing work.

How to use this tool

  1. Enter the equipment name and ID, the department and the planning period, for example the 2027 calendar year or the first half of the year.
  2. List the tasks by component: what to inspect, clean, lubricate, adjust or replace. In Approved basis, cite where the task and interval come from, such as a section of the manufacturer's manual or your own maintenance instruction.
  3. Write the interval in the unit that drives wear: calendar time (weekly, monthly, every six months) or usage (every 500 operating hours, every 100,000 cycles). Enter the next due date for each task and the person or contractor responsible.
  4. When a task is done, enter the completed date and the result, for example "belt tension adjusted, within limits" or "bearing noise, repair requested". Faults that need a repair go on a repair request, and completed work is added to the equipment history card.
  5. Download the Excel file and review it every week: a row whose due date has passed with no completed date is overdue PM.

Good to know

  • Confirm the current maintenance instructions for the actual equipment before setting intervals or performing work.

Frequently asked questions

What should a preventive maintenance plan include?

For each machine: the components or areas to look after, the task for each, the interval, the next due date, who is responsible, and room to record when the task was done and what was found. Writing down the basis for each task (the manufacturer's manual, an internal instruction or an inspection rule that applies to you) shows why the interval was chosen and who may change it.

How do I set PM intervals?

Start with the manufacturer's recommendations and adjust them with your own history. If the equipment history card shows the same failure before the task is due, shorten the interval or add an inspection; if inspections find nothing over a long period, the interval can be lengthened with approval. Use operating hours or cycles instead of calendar time when usage varies a lot from month to month.

What is the difference between time-based, usage-based and condition-based maintenance?

Time-based maintenance is done at a calendar interval, such as monthly lubrication. Usage-based maintenance is triggered by running hours, cycles or output. Condition-based maintenance is done when a measurement such as vibration, temperature or oil analysis shows deterioration. This sheet schedules time- and usage-based tasks; the measurements that feed condition-based decisions can be listed as tasks with their own interval.

How do I make a yearly PM schedule in Excel?

Set the planning period to the year and list each recurring task once with its interval and first due date. After each completion, record the date and result and enter the next occurrence on a new row, or carry it to the next period's plan. Keep the full maintenance history on the equipment history card, and check the plan every week for rows that are past due.

How does the plan connect to repair requests and the equipment history card?

The plan says what should be done and when. If a PM task finds a fault that cannot be fixed during the task, raise a repair request with the symptom and the date it is needed by. When the PM or repair is complete, add a dated line to the machine's equipment history card with the parts, cost and downtime, so the history shows whether the intervals are working.

Do I have to retype the equipment details on related templates?

No. After you review them, Connect templates can carry the company, department, equipment name and equipment ID into related templates such as the repair request and the equipment history card. The task rows are not copied into other documents, so record completed work on each one. Keep a named copy in your workspace to start the next period's plan from this one.

Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.