Quality inspection report
The sheet an inspector fills in when a lot arrives, leaves a process or is released for shipping. Record the report number, product, lot, lot size and sample size in the header, then list each inspection item with its specification, tolerance and method, enter up to five readings and mark pass or fail. The final decision and what happens to rejected product go in the boxes below, with inspector, reviewer and approver signatures.
Fill it in right here
Click any blank cell and type. Totals and amounts calculate as you go, and you can print it, save it as PDF or download the filled-in Excel file.
My documents
Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.
| No. | Inspection item | Specification | Tolerance | Method / instrument | Sample 1 | Sample 2 | Sample 3 | Sample 4 | Sample 5 | Result | Notes |
|---|---|---|---|---|---|---|---|---|---|---|---|
Sample size and the accept/reject rule come from your own inspection standard or sampling plan (for example an AQL table under ISO 2859-1 or ANSI/ASQ Z1.4); the file contains none. Mark an item Pass only when every reading is within specification and tolerance.
Final decision: accept or reject the lot and give the rejected quantity. Disposition: what happens to rejected product (rework, sorting, use as is by concession, return to supplier or scrap); record it in a nonconformance report.
How to use this tool
- Choose the inspection type (incoming, in-process or final) and enter the report number, product, part number, lot, supplier or process, lot size and sample size in the header.
- Open the Excel file and list each inspection item with its specification, tolerance and the method or instrument; type up to five sample readings per item and choose pass or fail.
- Write the final decision and the rejected quantity, note how rejected product will be handled, and collect the inspector, reviewer and approver signatures.
Good to know
- Sample size and the accept/reject rule come from your own inspection standard or sampling plan (for example an AQL table under ISO 2859-1); the file contains none.
Frequently asked questions
What is the difference between incoming, in-process and final inspection?
Incoming inspection checks purchased material or parts against the purchase specification before they enter stock or production. In-process inspection checks product between operations, so that defects are caught where they are made. Final or outgoing inspection checks finished product against the customer specification before shipping. One layout serves all three: choose the type in the header and name the supplier or process in the next field.
How do I fill in specification, tolerance and the five readings?
Copy the dimension or requirement from the drawing or specification into the specification column, for example 25.0 mm, and the allowed deviation into the tolerance column, for example ±0.1. Measure the sample pieces and type the results into the sample columns; leave unused columns empty if you measure fewer than five. Mark the item as pass only when every reading is within specification and tolerance.
How many pieces should I sample, and when is a lot accepted?
That is set by your sampling plan, not by this file. Many companies use an AQL table from ISO 2859-1 or ANSI/ASQ Z1.4, which gives the sample size for a lot size and the maximum number of defective pieces allowed for acceptance. Enter the lot size and the sample size from the plan in the header, and write the accept or reject decision in the final decision box.
What happens when a lot fails inspection?
Segregate and label the rejected product so it cannot be used by mistake, write the rejected quantity and the proposed disposition in the bottom boxes, and open a nonconformance report to record the decision: rework, sorting, use as is by concession, return to the supplier or scrap. If the same problem comes back, start a CAPA to find and remove the cause.
Which instruments should I list, and do they need to be calibrated?
Name the gauge, caliper or tester in the method column, ideally with its control number, so every reading can be traced to an instrument. Instruments used for acceptance decisions must be within their calibration period, which is why the calibration register in this library lists each one with its next due date. A reading taken with an expired instrument puts the whole report in doubt.
Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.