Improvement Proposal

Make a proposal testable by stating the current problem, the proposed change and how success will be measured. Separate expected savings or quality gains from observed results. The action table identifies the work, owner and due date needed to evaluate the change.

Fill it in right here

Click any blank cell and type. Print your entries, save them as PDF or download the filled-in Excel file.

My documents

Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.

Open all my documents
Improvement Proposal
ActionOwnerDue dateStatus / measured result
Current problem and evidence
Proposed change
Expected effect and assumptions
Measurement and verification plan

Keep assumptions beside expected benefits, then record the measured period and result before calling an improvement complete.

How to use this tool

  1. Enter company, department, prepared by, project in the header for the work you are recording.
  2. Expected benefits are estimates until the measurement plan is completed. Record the baseline period and relevant costs so that an apparent saving is not simply a shift of work or expense to another team.
  3. Save a named document in your workspace and copy it for the next period. Use Connect templates to review shared header details before creating separate drafts.

Good to know

  • Keep assumptions beside expected benefits, then record the measured period and result before calling an improvement complete.

Frequently asked questions

Is an estimated saving enough for expected benefits?

Include the assumptions. Saving two minutes on each of 100 monthly jobs means 200 minutes, before any conversion to money. Record the rate used for that conversion and keep measured results in the verification section.

How should ownership work across departments?

Split the work into actions, each with one accountable contact and a due date. Explain dependencies and supporting teams in the proposal. Recording a name does not confirm that the person has accepted the work.

When should an action be marked complete?

Distinguish drafting, review, acceptance and implementation in the status field. If implementation is complete but the benefit is unmeasured, record the metric and planned measurement date in verification.

Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.