• Calculation & analysis
  • Safety & environment

Risk assessment template

A hazard-by-hazard risk assessment sheet for a process, machine or work area. List each task step and its hazard, score likelihood and severity from 1 to 5, and the risk score (likelihood × severity) fills in by formula. Then record the controls already in place, the improvement you will make, the risk left afterwards, the owner and the due date.

Fill it in right here

Click any blank cell and type. Totals and amounts calculate as you go, and you can print it, save it as PDF or download the filled-in Excel file.

My documents

Saved in this browser only. Save versions to keep separate customers or dates. Clearing site data removes them; download important files.

Open all my documents
Risk Assessment Sheet
No.Task / stepHazard and possible harmLikelihood (1–5)Severity (1–5)Risk (L × S)Existing controlsImprovement measuresResidual riskOwnerDue date

Risk = likelihood × severity, each scored 1–5, so the score runs from 1 to 25. Example bands: 1–4 low, 5–9 medium, 10–25 high. Set your own bands and the action each one requires before you start scoring.

Example scales. Likelihood: 1 rare, 2 unlikely, 3 possible, 4 likely, 5 almost certain. Severity: 1 first aid only, 2 medical treatment, 3 lost-time injury, 4 permanent disability, 5 fatality.

Choose controls in this order: eliminate, substitute, engineering controls, administrative controls, PPE. Re-score once the improvement is in place, and review the assessment when the process, machine or substance changes and after any accident or near miss.

Employers in most countries must assess workplace risks; the method, review interval and record keeping depend on local law (as of 2026; check the rules that apply to you). In Korea the duty comes from Article 36 of the Industrial Safety and Health Act.

Prepared by
Reviewed by
Approved by

How to use this tool

  1. Enter the site, the process or task being assessed, the assessment date, the assessor and the workers who took part; the values are written into the file.
  2. Open the Excel file and list each task step with its hazard and the controls already in place, then score likelihood and severity from 1 to 5. The risk score is calculated for you. For every hazard your own scale rates medium or high, write an improvement measure.
  3. Once the improvement is in place, re-score and enter the residual risk, add the owner and due date, and collect the signatures. Keep the sheet with your assessment records and review it whenever the work changes.

Good to know

  • The 1–4 / 5–9 / 10–25 bands are an example, not a legal scale; set your own bands and required actions. Statutory risk assessment duties (who assesses, how often, how long records are kept) depend on your country (as of 2026).

Frequently asked questions

How is the risk score calculated?

Risk equals likelihood times severity, each scored from 1 to 5 for the hazard as it stands today, with the existing controls in place, so the score runs from 1 to 25. The risk column is a formula that stays blank until both scores are entered. The sheet suggests example bands of 1–4 low, 5–9 medium and 10–25 high, but you should set the bands and the action each one requires in your procedure first.

What is the difference between a hazard and a risk?

A hazard is the source of possible harm, such as an unguarded roller, a wet floor or a solvent. The risk is how likely that harm is and how bad it would be. Write the hazard together with the harm, for example "hand drawn into unguarded roller: crush injury", then score that sentence so every assessor is scoring the same thing.

How should I choose controls for the improvement column?

Work down the hierarchy of controls: eliminate the hazard, substitute something safer, add engineering controls such as guards or ventilation, then administrative controls such as procedures and training, and personal protective equipment last. Higher levels reduce risk more reliably, so note which level each measure is at and re-score the residual risk once it is in place. The percentage calculator linked on this page gives the reduction between the two scores.

How often should a risk assessment be reviewed?

Review it whenever something changes, such as a new machine, material or process, a layout change, or after any accident or near miss. Many sites also set a fixed interval, commonly once a year. Statutory duties on who must assess, how often and how long records are kept depend on the country (as of 2026), so check the rules that apply to you.

Can this sheet serve as the formal assessment record?

It holds what management systems and inspectors usually look for: what was assessed, who took part, the hazards, the risk before and after controls, the actions with owners and dates, and a sign-off. Whether it satisfies a specific law or an ISO 45001 audit depends on your procedure, so match the scales and wording to it before you rely on it.

Templates are starting points. Adapt the fields and limits to your own procedures and the rules that apply to you.